Engineering, design and fabrication of equipment for onshore and offshore production facilities has been the mainstay of EN-FAB’s business. EN-FAB personnel are particularly adept in design, engineering, and construction of production equipment such as; two and three phase separators, heater-treaters, desalters, demulsifiers, glycol dehydration units, fuel gas skids, vapor recovery units, etc. Qualified service technicians are available for start-up service and commissioning. This combination of unique abilities has enabled EN-FAB, Inc. to be a leader in supplying Early Production Facilities and Systems.


An early production facility is a complete facility to produce oil and gas and dispose of the produced water. This facility is usually located on land, but barge facilities are also becoming common. The size range is usually between 5,000 to 60,000 barrels per Early production facilities are becoming very important to the oil companies due to the necessity to get a field or some part of a field on line and producing in a minimum amount of time. EN-FAB can provide a complete production facility in short time, including all the equipment to treat the oil, gas, and water, plus the equipment for power generation, lighting, control rooms and site design.

Early production facilities are becoming very important to the oil companies due to the necessity to get a field or some part of a field on line and producing in a minimum amount of time. EN-FAB can provide a complete production facility in short time, including all the equipment to treat the oil, gas, and water, plus the equipment for power generation, lighting, control rooms and site design.

Features

  • Oil and gas production are brought on stream quicker

  • Single source responsibility

  • Guaranteed process design

Applications

Anywhere in the world where oil and gas need to be brought on-stream in a short duration of time.


Early Production Facility in Egypt

This is an early production facility in Egypt known as Gazwarina project. It was designed, fabricated and tested by EN-FAB,Inc. for the West Gemsa Petroleum Company.


50,000 BPD Early Production Facility in Kuwait

This is a 50,000 BPD early production facility built to replace the one destroyed in Kuwait during the Gulf War. The entire facility known as GC 17 was redesigned, engineered and fabricated by EN-FAB, Inc. in seventeen weeks from the award date of the contract. EN-FAB, Inc. personnel worked twenty-four hours a day, seven days a week for all of the seventeen weeks.


Early Production Facility in Peru

This early production facility in Peru is located in the Amazon jungle. The only means of transportation was by the helicopter.All equipment shown had to be flown in by helicopter

3905 Jensen Drive, Houston, Texas 77026 USA
Phone: 713-2254913 Fax: 713-224-7937