go to main page English
Equipment & Services

One Through steam generation Project, Sultanate of Oman

In 2006, EN-FAB, Inc. was awarded a contract to design, manufacture, supply, install and commission One Hundred MMBTU/Hr, Once Through Steam Injection Systems, to an oilfield in the Sultanate of Oman. Of the forty-two (42) units supplied over the past two years, twenty-two (22) are currently in operation, with the balance to be commissioned in the near future.


Each system consists of the following units:

  • Once Through Steam Generator (OTSG)

  • Fuel Gas Skid

  • Burner Management System

  • Low and High Pressure Pumps for Feed water

  • Feed water Heat Exchanger

  • Steam Separator, designed for 99.95% separation efficiency

  • Blowdown and recirculation system

  • All interconnect piping and valves

  • The control system automatically adjusts the fuel – water ratio parameter to keep the steam quality at 80%, all the time and at all operating levels.

This field will require many more OTSG Systems in the near future





3905 Jensen Drive, Houston, Texas 77026 USA
Phone: 713-2254913 Fax: 713-224-7937
e-mail:sales@en-fabinc.com
Website:www.en-fabinc.com


Copyright 2009 EN-FABINC All rights reserved